[nggallery id=3]
Paul is rebuilding the front shower wall framing and preparing the floor for constructing the shower pan. The wall looks about 1000% more sturdy.
The framing for the dam will be completed tomorrow.
We decided to go with a 16″ wide corner shelf, 40″ AFF. Laurel’s out hunting for curtain options.