Haven’t posted here for a long time, but it is time to start another project–the LAST tile project. Bath #2, aka. the hall bath is going to get tiled to match the shower in the master bath. Paul Owen from Absolute Tile and Marble is scheduled to begin work next week; a new valve assembly is on the way from the mainland, tile has been purchased and I think I have an acceptable bid on a glass door.
The only other additional work I have planned for this go-round is to see if I can replace the noisy vent fan in bath #2 and maybe try to figure out a way to make the eight-bulb bar light fixture look a bit more modern.